Hurricane’s technical committee has concluded that there is a reasonable probability that the oil water contact (OWC) in the Lancaster field is shallower than the range of OWCs estimated in the 2017 competent person’s report (CPR) by RPS Energy. As a result, the company believes there is a risk that the estimated reserves for the Lancaster early production system (EPS) and the contingent resources across the West of Shetland portfolio will be materially downgraded. Given the range of outcomes which could emerge from the technical review, and less than a month to the interim results on 11 September 2020, we believe suspending our valuation is a prudent move until there is further clarity on reserves, resources and remedial actions being considered to mitigate potential reserve downgrades.
Join 55,000+ investors, including top global asset managers overseeing $13+ trillion.
Upgrade later to our paid plans for full-access.