Orosur’s H118 results indicate San Gregorio (SG) continues to perform well, albeit with a small deferral of 2koz of gold production to narrow FY18 guidance from 30-34koz to c 30koz. Orosur’s focus remains on the most profitable mining possible rather than extracting its reserves ad hoc. SG’s geological data are being thoroughly examined such that additional production opportunities are identified. The process has already yielded SG UG West (a current mainstay of production), with SG Central located adjacent and being developed to provide production during H218. Veta A is another old pit reopening as an underground mine project. We consider that Orosur should be able to return to profitability by end FY18, with upside clearly linked to the very positive initial drill results coming from its increasingly important Colombian asset base.
Join 55,000+ investors, including top global asset managers overseeing $13+ trillion.
Upgrade later to our paid plans for full-access.